Costa Blanca North 7 May – 13 May 2015 Issue 1557

1
Costa Blanca North 7 May - 13 May 2015 Issue 1557


Download pdf to read offline

1 COMMENT

  1. Has any of your readers ever been billed by iberdrola for a meter that was not installed on their property (someone elses meter) … Iberdrola started billing me for a meter that they allege was installed on the outside of my property in Oliva on 25/6/14 … but no new meter has ever been installed on my property …the original meter is inside and is still working as it should ….. I am currently unable to return to Spain because of ongoing health problems and despite dozens of emails and telephone calls to iberdrola ….they are still taking hundreds of euro’s from my bank account and seemingly fobbing me off …it would be an extremely simple matter for an iberdrola employee to visit the extrerior of my property (a small townhouse with a frontage of approx 4metres wide) and see for themselves that there is no meter installed outside …and at the same time see exactly who’s property the allegedly installed meter is connected to ….. and then perhaps give me a refund of the money that they are stealing from me

LEAVE A COMMENT

Please enter your comment!
Please enter your name here